Place of Origin: | Zhejiang, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
The system consists of the computer(PC), current transformer calibrator, voltage and current control unit, and current/voltage transformer load box, etc. for various use purposes, the options of standard current transformer plus current booster, standard voltage transformer plus voltage booster, voltage withstand controller, test rack, etc., are available to for extending the system’s function.
The system can automatically test the basic errors of transformers, such as cophase component, quadrature component, and etc., and automatically measure impedance and admittance of secondary load of transformer, in accordance with the test points specified by relevant stipulations or customized by users.
Technical parameters |
|||
Power supply |
3-phase power supply 3x220V±10%; |
||
distortion |
<0.5% |
||
accuracy class |
1.0 / 2.0 |
||
Max. output power |
6kVA |
||
Output regulation precision |
<0.02% |
||
Cophase component |
0.0001~200.0(%) |
resolution |
0.0001 |
Quadrature component |
0.001~1000.0(‘) |
resolution |
0.001 |
Impedance |
0.0001~100.0() |
resolution |
0.0001 |
admittance |
0.0001~100.0(mS) |
resolution |
0.0001 |
Dimension(LxWxH) |
275*245*145 |
||
Weight |
3kg |
Guangzhou GENY Electric Company [China (Mainland)]
Business Type:Manufacturer
City: Guangzhou
Province/State: Guangdong
Country/Region: China (Mainland)